439 ROUTE 17 NORTH | MAHWAH NJ, USA |
PHONE (201) 236-0969 | FAX (201) 584-0229 |
Info@theEEIgroup.com |
Preparation
Firstly, please measure the temperature and make sure that the job-site, demolition agent, rock, container and temperature are in compliance with requirements. If traditional type is to be used, please select correct specification. If RockFrac® NEDA to be used, please add inhibitor as instructed.
a. Cracking agent
b. Clean and cold-water
c. Plastic bucket
d. Wooden rod
e. Safety goggles
f. Rubber glove
g. Cap (wooden or iron wedge)