439 ROUTE 17 NORTH | MAHWAH NJ, USA |
PHONE (201) 236-0969 | FAX (201) 584-0229 |
Info@theEEIgroup.com |
Loading
For vertical holes, pour RockFrac® NEDA mixed with water into hole directly. For horizontal and slant holes, insert a slightly smaller plastic pipe into the hole, and then fill the expansive mortar into the pipe slowly, withdrawing the pipe from the hole simultaneously. Quickly block the hole with a cap after feeding.